• Dutch
  • English

Dredging work completed

With the completed dredging work, a major step has been taken in the further development of the Hub. Now that the correct depth has been reached, ships can be loaded and unloaded.

Share on facebook
Share on twitter
Share on linkedin

WIJ GEBRUIKEN COOKIES

Om het gebruik van de website te analyseren en het gebruiksgemak te verbeteren.