Construction Update Week 45

Clever concrete work by the men from Voorbij and Vroom. They have completed the piling work. That means all 5,600 piles have been driven into the ground! A new milestone for the team. This week we started placing the floor in the sprinkler cellar. After this, it can be filled with water. We also started with the mezzanine floor at a height of 18 metres: the top layer of the logistics halls. The building is reaching great heights. On the north side of the building, prefabricated boxes are placed at a height of 13 metres for the dock levellers of the trucks.